DC/26/2504/DRC
|
Discharge of Condition Nos. 3 and 5 of DC/16/3159/FUL - Improvements to existing flood defences comprising: a mix of hard and soft engineering works which will raise, renew or replace existing flood defence structures and affecting buildings and structures within the curtilage of a listed building; replacement of ground floor windows to the east elevation of the concert hall - Ecological Mitigation and Improvement Plan and i) Specification for new walling brickwork; brick bond; mortar type; coping; and junction with existing bridge to be supplied. ii) Replacement steel moorings to existing quayside upstand where replaced to match existing in position, size and material iii) Details of the connection between the new flood wall and north gable of the concert hall iv) Details of new platform lift from external terrace to refectory/concert hall entrance on south elevation to show appearance, position, size. v) Detail of the gradient of the footpath/bank at the eastern end of the works proposed in Area 3.
|
Snape Maltings Snape Bridge Tunstall Suffolk IP17 1SR
Please note the Public Access system will timeout after 30 minutes of inactivity. While drafting a comment, if a user is logged out due to a time-out, the comment will be retained by a user’s browser’s cookies for up to two days on the same device until its submission. Upon clicking submit, your name and address will be published immediately to the Public Access website. Comments received will be available via the Documents and Comments tab on the next working day after submission. Major applications can take up to 5 working days. Any comments that contain offensive, defamatory or discriminatory language will not be considered in determining the application and may be removed. East Suffolk Privacy Notice.
You must log in to make a comment.
Not got a login? Register here.

