DC/26/1300/DRC
|
Discharge of Condition Nos. 4 and 10 of DC/23/2349/FUL - Two double skinned fuel tanks will be installed on the existing site for the offloading and loading of fuels. These tanks will be installed on new reinforced concrete slabs. An electrical GRP pre-fabricated unit will be installed for the electrical connections. A catchment area around the two tanks will be surrounded by drainage channels to capture any spills and runoff from the loading of trucks. These channels will lead to sumps which will be connected to a full class 1 interceptor. Existing underground tanks to be foam filled. - OHES Level 4 Assessment and OHES Supplementary Environmental Assessment
|
Haven Filling Station Dock Road The Docks Felixstowe Suffolk IP11 3SH